Construction of "Kelbajar GDS" gas pipeline branch
Construction of "Aghdam-Kelbajar" gas pipeline and "Kelbajar GDS" gas pipeline branch with gas distribution stations
2024
Start Date
2025
End Date
Scroll Down
About Project
Construction of "Aghdam-Kelbajar" gas pipeline and "Kelbajar GDS" gas pipeline branch with gas distribution stations
Gasification works were carried out in Kelbajar region in 2024 by ELTA DEVELOPMENT company.
The gas line laid with 530 mm steel pipes was carried through difficult terrain conditions, cutting through mountains. All works were carried out at an altitude of 2600 meters above sea level.
More than 300 equipment and about 400 personnel were involved in the gasification works. Road opening works were carried out for about 130 km in the area
Project Features
Gas pipeline
Gas line laid with 530 mm steel pipes
Mountainous area
Works at an altitude of 2600 meters above sea level